RAMS for general builders

A general builder's job covers many trades, so the RAMS covers more hazards than most: access, dust, noise, asbestos, deliveries and working around the people who live there.

General builder preset: 16 hazards with controls, 9 steps of work, PPE and plant, ready to edit and download as a PDF.

Make RAMS for general builders

Hazards and controls

These are the hazards the general builder preset starts with. Residual risk is after the controls, on a 5 × 5 likelihood and severity scale.

Falls from ladders or stepladders

Work at height: ladders and stepladders · Who: Operatives · Residual risk: Medium

  • Ladders used only for short-duration (up to 30 minutes in one position), light work where a tower or podium is not reasonably practicable
  • Professional ladders to BS EN 131, checked before use (stiles, feet, rungs, locking bars) and taken out of use if damaged
  • Ladder set at 1 in 4, on firm level ground, tied or footed; extends 1 m above the landing point
  • Three points of contact kept; no overreaching, belt buckle stays inside the stiles
  • No work from the top three rungs of a ladder or the top two treads of a stepladder

Tools or materials falling from height

Work at height: ladders and stepladders · Who: Operatives, client, public · Residual risk: Low

  • Area below kept clear or coned off
  • Tools carried in a belt or pouch, not in the hands while climbing
  • Nothing left on top of stepladders

Falls from the working platform

Work at height: mobile access towers and podiums · Who: Operatives · Residual risk: Medium

  • Tower erected, altered and dismantled by a PASMA-trained person following the manufacturer's instructions
  • Guardrails and toe boards fitted on every working platform
  • Tower inspected before first use, after alteration and after any event that could affect it; inspection recorded

Tower overturning or collapsing

Work at height: mobile access towers and podiums · Who: Operatives, others nearby · Residual risk: Medium

  • Castors locked and outriggers or stabilisers fitted; base on firm, level ground
  • Tower never moved with people or materials on it
  • Safe working load and height-to-base ratio not exceeded; no ladders or steps used on the platform
  • Not used in high winds or near overhead power lines

Cuts, entanglement and flying particles from tools

Hand and power tools · Who: Operatives, others nearby · Residual risk: Medium

  • Tools suitable for the task, maintained, with guards fitted
  • Only trained and competent people use powered tools
  • Blades and discs changed with the tool unplugged or battery removed
  • Eye protection worn when cutting, drilling or grinding

Electric shock from tools and leads

Hand and power tools · Who: Operatives · Residual risk: Medium

  • 110 V (centre-tapped) or battery tools on site; leads checked before use
  • Portable equipment inspected and tested at suitable intervals
  • Leads routed away from water and sharp edges

Back and muscle injuries from lifting and carrying

Manual handling · Who: Operatives · Residual risk: Medium

  • Loads assessed before lifting; mechanical aids (trolleys, sack trucks, hoists) used where possible
  • Heavy or awkward loads lifted by two people
  • Loads broken down into smaller units; materials delivered close to where they are needed
  • Operatives shown good lifting technique

Breathing in silica dust (lung disease)

Dust: cutting, chasing and drilling masonry and concrete · Who: Operatives, client, others nearby · Residual risk: Medium

  • Tools with on-tool extraction to an M- or H-class vacuum, or water suppression
  • FFP3 mask, face-fit tested, worn as well as extraction
  • Work area closed off and ventilated; others kept away
  • Dust cleaned with an M-class vacuum, never by dry sweeping or compressed air

Hearing damage from noisy tools

Noise and hand-arm vibration · Who: Operatives, others nearby · Residual risk: Medium

  • Quieter tools and methods chosen
  • Hearing protection worn where noise is above 85 dB(A) or people must shout to be heard 2 m away
  • Others kept away from noisy work

Hand-arm vibration (HAVS, white finger)

Noise and hand-arm vibration · Who: Operatives · Residual risk: Medium

  • Low-vibration tools chosen and maintained
  • Trigger time limited using the tool's vibration level and the HSE exposure points system
  • Tasks rotated; breaks taken; hands kept warm
  • Symptoms reported; health surveillance where exposure is regular

Disturbing asbestos in buildings built before 2000 (lung disease)

Asbestos · Who: Operatives, client, occupants · Residual risk: Medium

  • Client asked for the asbestos register or survey before work; a refurbishment survey where work is intrusive
  • Operatives have asbestos awareness training
  • If suspected asbestos is found: stop work, keep people out of the area, tell the client and do not restart until it has been tested
  • Licensed work only by a licensed contractor

Striking hidden cables, pipes or gas mains when drilling, cutting or digging

Hidden and buried services · Who: Operatives, client · Residual risk: Medium

  • Service drawings and client information checked before work
  • Walls and floors scanned with a cable and pipe detector; buried services traced with a CAT and Genny
  • Hand-dug trial holes before machine digging near services
  • Water and gas located and the stopcock or ECV position confirmed before starting

Skin, eye or breathing harm from adhesives, sealants, solvents, cement and cleaning products

Hazardous substances (COSHH) · Who: Operatives, client · Residual risk: Medium

  • Safety data sheets and COSHH assessments available for products used
  • Less harmful products chosen where possible
  • Gloves, eye protection and good ventilation as the data sheet says
  • Wet cement and lime kept off skin; washing facilities used before eating
  • Products stored in their original containers, lids on, away from children

Injury to the client, children, pets or the public

Working in occupied homes and premises · Who: Client, occupants, public · Residual risk: Low

  • Work area agreed with the client and closed off with barriers or doors
  • Tools, materials and chemicals never left unattended in reach of children
  • Access routes and fire escape routes kept clear
  • Occupants told about noisy, dusty or disruptive work in advance
  • Services only isolated after warning the occupants

Slips, trips and falls on the same level

Slips, trips and housekeeping · Who: Operatives, client, public · Residual risk: Low

  • Work area kept tidy as work goes on; waste cleared at least daily
  • Leads and hoses routed away from walkways or covered
  • Good lighting on access routes; spills cleaned at once
  • Floor protection taped down at the edges

Being struck by vehicles reversing or delivering

Deliveries and vehicles on site · Who: Operatives, public · Residual risk: Medium

  • Deliveries planned and booked; unloading area agreed
  • Banksman used for reversing; pedestrians kept apart from vehicles
  • Hi-vis worn in vehicle areas

Sequence of work

  1. Agree the programme, access, deliveries, welfare and working hours with the client
  2. Check the asbestos survey and the service drawings before any demolition, drilling or digging
  3. Set up the site: barriers, signage, skip, welfare and storage
  4. Plan work at height; erect towers or arrange scaffold before high-level work
  5. Carry out strip-out and building work in the planned sequence with dust and noise control
  6. Coordinate other trades; brief everyone on the RAMS and site rules
  7. Inspect access equipment, excavations and temporary works as required
  8. Clean the site daily and remove waste
  9. Snag, clean and hand over to the client

PPE

Safety boots, Hi-vis vest, Hard hat, Eye protection, Gloves, Hearing protection, FFP3 dust mask (face-fit tested).

Plant and equipment

  • Mobile tower or scaffold
  • Ladders and stepladders (BS EN 131)
  • 110 V or battery power tools with dust extraction
  • Disc cutter with water suppression
  • Cable and pipe detector
  • Skip and site barriers

Every job is different: delete what does not apply, add site-specific hazards and name the people responsible before you issue the RAMS.

Questions

Do I need a construction phase plan as well?

Under CDM 2015 every construction project needs one, including domestic jobs. RAMS Maker has a separate construction phase plan generator.

Who prepares RAMS on a job with subcontractors?

Each contractor prepares RAMS for their own work. The principal contractor checks they fit together and coordinates the site.

Other trades: Roofers · Plumbers and heating engineers · Painters and decorators · Carpenters and joiners · Plasterers and dryliners · all trades

Related: RAMS template · Method statement template · Toolbox talks

Checked against hse.gov.uk on 31 October 2026.

Get early access to Pro