RAMS for carpenters and joiners
Joiners use some of the most dangerous hand-held tools on site and produce wood dust that can cause asthma and cancer. A good RAMS covers the tools, the dust and the lifting as well as the access.
Carpenter or joiner preset: 11 hazards with controls, 8 steps of work, PPE and plant, ready to edit and download as a PDF.
Make RAMS for carpenters and joinersHazards and controls
These are the hazards the carpenter or joiner preset starts with. Residual risk is after the controls, on a 5 × 5 likelihood and severity scale.
Cuts, entanglement and flying particles from tools
Hand and power tools · Who: Operatives, others nearby · Residual risk: Medium
- Tools suitable for the task, maintained, with guards fitted
- Only trained and competent people use powered tools
- Blades and discs changed with the tool unplugged or battery removed
- Eye protection worn when cutting, drilling or grinding
Electric shock from tools and leads
Hand and power tools · Who: Operatives · Residual risk: Medium
- 110 V (centre-tapped) or battery tools on site; leads checked before use
- Portable equipment inspected and tested at suitable intervals
- Leads routed away from water and sharp edges
Breathing in wood dust (asthma, cancer from hardwood dust)
Dust: cutting and sanding timber and board · Who: Operatives · Residual risk: Medium
- Saws and sanders with extraction to an M-class vacuum
- FFP3 mask worn for dusty tasks; cutting done outside or in a ventilated area
- Dust cleaned by vacuum, not sweeping
Back and muscle injuries from lifting and carrying
Manual handling · Who: Operatives · Residual risk: Medium
- Loads assessed before lifting; mechanical aids (trolleys, sack trucks, hoists) used where possible
- Heavy or awkward loads lifted by two people
- Loads broken down into smaller units; materials delivered close to where they are needed
- Operatives shown good lifting technique
Falls from ladders or stepladders
Work at height: ladders and stepladders · Who: Operatives · Residual risk: Medium
- Ladders used only for short-duration (up to 30 minutes in one position), light work where a tower or podium is not reasonably practicable
- Professional ladders to BS EN 131, checked before use (stiles, feet, rungs, locking bars) and taken out of use if damaged
- Ladder set at 1 in 4, on firm level ground, tied or footed; extends 1 m above the landing point
- Three points of contact kept; no overreaching, belt buckle stays inside the stiles
- No work from the top three rungs of a ladder or the top two treads of a stepladder
Tools or materials falling from height
Work at height: ladders and stepladders · Who: Operatives, client, public · Residual risk: Low
- Area below kept clear or coned off
- Tools carried in a belt or pouch, not in the hands while climbing
- Nothing left on top of stepladders
Hearing damage from noisy tools
Noise and hand-arm vibration · Who: Operatives, others nearby · Residual risk: Medium
- Quieter tools and methods chosen
- Hearing protection worn where noise is above 85 dB(A) or people must shout to be heard 2 m away
- Others kept away from noisy work
Hand-arm vibration (HAVS, white finger)
Noise and hand-arm vibration · Who: Operatives · Residual risk: Medium
- Low-vibration tools chosen and maintained
- Trigger time limited using the tool's vibration level and the HSE exposure points system
- Tasks rotated; breaks taken; hands kept warm
- Symptoms reported; health surveillance where exposure is regular
Disturbing asbestos in buildings built before 2000 (lung disease)
Asbestos · Who: Operatives, client, occupants · Residual risk: Medium
- Client asked for the asbestos register or survey before work; a refurbishment survey where work is intrusive
- Operatives have asbestos awareness training
- If suspected asbestos is found: stop work, keep people out of the area, tell the client and do not restart until it has been tested
- Licensed work only by a licensed contractor
Injury to the client, children, pets or the public
Working in occupied homes and premises · Who: Client, occupants, public · Residual risk: Low
- Work area agreed with the client and closed off with barriers or doors
- Tools, materials and chemicals never left unattended in reach of children
- Access routes and fire escape routes kept clear
- Occupants told about noisy, dusty or disruptive work in advance
- Services only isolated after warning the occupants
Slips, trips and falls on the same level
Slips, trips and housekeeping · Who: Operatives, client, public · Residual risk: Low
- Work area kept tidy as work goes on; waste cleared at least daily
- Leads and hoses routed away from walkways or covered
- Good lighting on access routes; spills cleaned at once
- Floor protection taped down at the edges
Sequence of work
- Arrive, sign in and agree the work area with the client or site manager
- Set up a cutting area outside or in a ventilated room with extraction
- Lay floor protection
- Check walls and floors for hidden services before fixing
- Remove existing joinery where needed; denail and bag waste
- Cut and fit new timber, doors, frames, stairs or kitchens
- Sand and finish with dust extraction
- Clear waste, vacuum the area and hand over to the client
PPE
Safety boots, Eye protection, Hearing protection, FFP3 dust mask (face-fit tested), Knee pads.
Plant and equipment
- Mitre saw and track saw with M-class extraction
- 110 V or battery drills and impact drivers
- Cable and pipe detector
- Stepladders (BS EN 131) or podium
- Trestles and saw horses
Every job is different: delete what does not apply, add site-specific hazards and name the people responsible before you issue the RAMS.
Questions
Is wood dust a COSHH issue?
Yes. Hardwood and softwood dust have workplace exposure limits. Use extraction on saws and sanders and suitable masks where dust remains.
Do I need RAMS for a small domestic job?
You must always assess the risks. A written RAMS is needed if you employ five or more people, and most contractors and many clients ask for one anyway.
Other trades: Roofers · Plumbers and heating engineers · Painters and decorators · Plasterers and dryliners · Groundworkers and landscapers · all trades
Related: RAMS template · Method statement template · Toolbox talks
Checked against hse.gov.uk on 31 October 2026.