RAMS for carpenters and joiners

Joiners use some of the most dangerous hand-held tools on site and produce wood dust that can cause asthma and cancer. A good RAMS covers the tools, the dust and the lifting as well as the access.

Carpenter or joiner preset: 11 hazards with controls, 8 steps of work, PPE and plant, ready to edit and download as a PDF.

Make RAMS for carpenters and joiners

Hazards and controls

These are the hazards the carpenter or joiner preset starts with. Residual risk is after the controls, on a 5 × 5 likelihood and severity scale.

Cuts, entanglement and flying particles from tools

Hand and power tools · Who: Operatives, others nearby · Residual risk: Medium

  • Tools suitable for the task, maintained, with guards fitted
  • Only trained and competent people use powered tools
  • Blades and discs changed with the tool unplugged or battery removed
  • Eye protection worn when cutting, drilling or grinding

Electric shock from tools and leads

Hand and power tools · Who: Operatives · Residual risk: Medium

  • 110 V (centre-tapped) or battery tools on site; leads checked before use
  • Portable equipment inspected and tested at suitable intervals
  • Leads routed away from water and sharp edges

Breathing in wood dust (asthma, cancer from hardwood dust)

Dust: cutting and sanding timber and board · Who: Operatives · Residual risk: Medium

  • Saws and sanders with extraction to an M-class vacuum
  • FFP3 mask worn for dusty tasks; cutting done outside or in a ventilated area
  • Dust cleaned by vacuum, not sweeping

Back and muscle injuries from lifting and carrying

Manual handling · Who: Operatives · Residual risk: Medium

  • Loads assessed before lifting; mechanical aids (trolleys, sack trucks, hoists) used where possible
  • Heavy or awkward loads lifted by two people
  • Loads broken down into smaller units; materials delivered close to where they are needed
  • Operatives shown good lifting technique

Falls from ladders or stepladders

Work at height: ladders and stepladders · Who: Operatives · Residual risk: Medium

  • Ladders used only for short-duration (up to 30 minutes in one position), light work where a tower or podium is not reasonably practicable
  • Professional ladders to BS EN 131, checked before use (stiles, feet, rungs, locking bars) and taken out of use if damaged
  • Ladder set at 1 in 4, on firm level ground, tied or footed; extends 1 m above the landing point
  • Three points of contact kept; no overreaching, belt buckle stays inside the stiles
  • No work from the top three rungs of a ladder or the top two treads of a stepladder

Tools or materials falling from height

Work at height: ladders and stepladders · Who: Operatives, client, public · Residual risk: Low

  • Area below kept clear or coned off
  • Tools carried in a belt or pouch, not in the hands while climbing
  • Nothing left on top of stepladders

Hearing damage from noisy tools

Noise and hand-arm vibration · Who: Operatives, others nearby · Residual risk: Medium

  • Quieter tools and methods chosen
  • Hearing protection worn where noise is above 85 dB(A) or people must shout to be heard 2 m away
  • Others kept away from noisy work

Hand-arm vibration (HAVS, white finger)

Noise and hand-arm vibration · Who: Operatives · Residual risk: Medium

  • Low-vibration tools chosen and maintained
  • Trigger time limited using the tool's vibration level and the HSE exposure points system
  • Tasks rotated; breaks taken; hands kept warm
  • Symptoms reported; health surveillance where exposure is regular

Disturbing asbestos in buildings built before 2000 (lung disease)

Asbestos · Who: Operatives, client, occupants · Residual risk: Medium

  • Client asked for the asbestos register or survey before work; a refurbishment survey where work is intrusive
  • Operatives have asbestos awareness training
  • If suspected asbestos is found: stop work, keep people out of the area, tell the client and do not restart until it has been tested
  • Licensed work only by a licensed contractor

Injury to the client, children, pets or the public

Working in occupied homes and premises · Who: Client, occupants, public · Residual risk: Low

  • Work area agreed with the client and closed off with barriers or doors
  • Tools, materials and chemicals never left unattended in reach of children
  • Access routes and fire escape routes kept clear
  • Occupants told about noisy, dusty or disruptive work in advance
  • Services only isolated after warning the occupants

Slips, trips and falls on the same level

Slips, trips and housekeeping · Who: Operatives, client, public · Residual risk: Low

  • Work area kept tidy as work goes on; waste cleared at least daily
  • Leads and hoses routed away from walkways or covered
  • Good lighting on access routes; spills cleaned at once
  • Floor protection taped down at the edges

Sequence of work

  1. Arrive, sign in and agree the work area with the client or site manager
  2. Set up a cutting area outside or in a ventilated room with extraction
  3. Lay floor protection
  4. Check walls and floors for hidden services before fixing
  5. Remove existing joinery where needed; denail and bag waste
  6. Cut and fit new timber, doors, frames, stairs or kitchens
  7. Sand and finish with dust extraction
  8. Clear waste, vacuum the area and hand over to the client

PPE

Safety boots, Eye protection, Hearing protection, FFP3 dust mask (face-fit tested), Knee pads.

Plant and equipment

  • Mitre saw and track saw with M-class extraction
  • 110 V or battery drills and impact drivers
  • Cable and pipe detector
  • Stepladders (BS EN 131) or podium
  • Trestles and saw horses

Every job is different: delete what does not apply, add site-specific hazards and name the people responsible before you issue the RAMS.

Questions

Is wood dust a COSHH issue?

Yes. Hardwood and softwood dust have workplace exposure limits. Use extraction on saws and sanders and suitable masks where dust remains.

Do I need RAMS for a small domestic job?

You must always assess the risks. A written RAMS is needed if you employ five or more people, and most contractors and many clients ask for one anyway.

Other trades: Roofers · Plumbers and heating engineers · Painters and decorators · Plasterers and dryliners · Groundworkers and landscapers · all trades

Related: RAMS template · Method statement template · Toolbox talks